The problem: the grid can’t keep up
AI data centers demand massive, continuous baseload power — but U.S. grids are fragile, already stretched, and new capacity cannot be built fast enough. Utility interconnection queues now stretch two to five years, creating a critical bottleneck for data center developers.
The solution: power behind the meter
Behind-the-meter (BTM) power means building the generation source at the data center site itself, delivering 100% dedicated electricity without drawing from — or waiting on — the local grid.
100% Dedicated Power
Electricity flows directly from the on-site plant to your facility — no grid dependency, no queue.
Renewable & Reliable
Biocarbon wood pellets provide 24/7 baseload power at 95% reliability — unlike intermittent solar or wind.
Carbon-Negative
CO₂ is captured and permanently stored underground, making every kilowatt carbon-negative.
The reference facility: 250 MW BECCS
Carbon Strategists delivers a turnkey 250 MW BECCS “behind-the-meter” renewable power generation facility for data centers — providing leadership and coordination of all contractors needed to deliver the project:
- Biomass feedstock supplier
- Engineering design & manufacturing contractors
- Construction contractors
- CO₂ transportation contractor
- CO₂ storage provider
- CO₂ sales coordination
The economics
Assuming an average of 12 cents per kWh, power savings for a 250 MW behind-the-meter BECCS facility equal $263 million per year — while delivering carbon-negative, around-the-clock electricity.
Why behind-the-meter beats the grid
Bypass the Queue
Skip the multi-year utility interconnection backlog and Public Service Commission constraints entirely.
Diversify Energy Sourcing
While less efficient than natural gas, biomass reliability and carbon-negative potential let AI data centers diversify their energy mix.